If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
|
Thread Tools | Display Modes |
#11
|
|||
|
|||
projecting dates
If you check the original post, the brackets are correct. You added two
brackets to the formula given. So you must have added one at the start, which resulted in an Excel error, then fixed it by adding another. You'll save yourself a lot of trouble if you copy the formulas given rather than retyping them. Regards, Fred. "Sapper" wrote in message ... Hi Fred Ithink there was a bracket missing from original post formula below worked Thanks for input Sapper =DATE((YEAR(D9)+70),MONTH(D9),DAY(D9)-1) |
|
Thread Tools | |
Display Modes | |
|
|